Processos Vol V Pages 1121 to 1123 External diligence carried out on Casa Liliana 2007.05.14

1124  Search Warrant for Casa Liliana

External diligence carried out on Casa Liliana 2007.05.14

Today at 07h20, I, Joao Carvalho, together with three teams ( * ) who searched 2Casa Liliana” in Rua da Ramalhete … property of R.J.Q.E.Murat, report the following:
– Arriving at the location, the owner was contacted who locked away his dogs then conducted Support Team 1 onto the premises;
– Initially, the entire area, internal and external, was identified. The internal area comprises an entrance hall, two suites with room and WC, one bedroom with a conservatory, a large reception room, a sitting room with conservatory, a kitchen and a pantry with a small walled kitchen garden, a machine room, a WC and an adjoining suite with private WC (bedroom of R.Murat). The external area comprises a shed, by a greenhouse, a swimming pool, a machine room and a storehouse (the latter two situated below the pool);
– The searches began by Teams A1 and A2, inside and outside, being accompanied by J.A.Murat, mother of the owner;
– In the course of the search two rainwater cisterns were found next to the pool. They were partly emptied to facilitate a search by a diving team from the Fire Department of Luz-Lagos (Commandants Paulo Reis and Rui Rodrigues). The work results were negative.
– The GNR dog team commanded by First-Sergeant A.Silva used four dogs to search for a trace of Madeleine Beth McCann in the entire property (inside and outside). The work results were negative.
– In the location were three vehicles – VW Transporter; Peugeot 205; Hyundai Getz – all of which were searched.
– The entire property was inspected by colleagues from Local Crime Section and Police Science Laboratory, with respective photographic reports made, with special focus on R.Murat’s room and the vehicles.

( * ) [Names of the team members are given here in the report].

Everything was done according to the authorisations. Various items were seized and listed.
The work was completed at 21h00.

This RDE (Relatorio de Diligencia Externa) is appended to the Inquiry by – Signed – Joao Carvalho, Inspector.

Leave a Reply